River Forecast
Issued by NWS

Home |  Current Version |  Previous Version |  Text Only |  Print | Product List |  Glossary On
Versions: 1
322
FGUS53 KKRF 061506
RVFMOM

RIVER FORECAST
NWS MISSOURI BASIN RIVER FORECAST CENTER PLEASANT HILL MO
1505Z WED NOV 6 2024
:
: THIS PRODUCT HAS PRELIMINARY DATA AND SUBJECT TO REVISION.
: REFER TO YOUR LOCAL WFO FOR THE LATEST OFFICIAL RIVER FORECAST.

:    FORECAST GROUP IS MOMAIN-LONG


: ==>    This forecast includes obsd precip & 48 hours of QPF

:________________________________________________________________

:GAVINS POINT DAM, NE - MISSOURI RIVER     HSA - FSD
:LATEST  TOTAL OUTFLOW 32.035 KCFS AT 0500Z ON NOV 05


:
.ER GPDN1REL 20241106 Z DC202411061505/DH18/QTIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    32.004 /    32.004 /    32.004
.E2  : 1107 :   /    32.004 /    32.004 /    32.004 /    32.004
.E3  : 1108 :   /    32.004 /    32.004 /    32.004 /    32.004
.E4  : 1109 :   /    32.004 /    32.004 /    32.004 /    32.004
.E5  : 1110 :   /    32.004 /    32.004 /    32.004 /    32.004
.E6  : 1111 :   /    32.004 /    32.004 /    32.004 /    32.004
.E7  : 1112 :   /    32.004 /    32.004 /    32.004 /    32.004
.E8  : 1113 :   /    32.004 /    32.504 /    32.504 /    32.504
.E9  : 1114 :   /    32.504 /    32.504 /    32.504 /    32.504
.E10 : 1115 :   /    32.504 /    32.504 /    32.504 /    32.504
.E11 : 1116 :   /    32.504 /    32.504 /    32.504 /    32.504
.E12 : 1117 :   /    32.504 /    32.504 /    32.504 /    32.504
.E13 : 1118 :   /    32.504 /    32.504 /    32.504 /    32.504
.E14 : 1119 :   /    32.504 /    34.004 /    34.004 /    34.004
.E15 : 1120 :   /    34.004 /    34.004 /    34.004 /    34.004
.E16 : 1121 :   /    34.004 /    34.004 /    34.004 /    34.004
.E17 : 1122 :   /    31.003 /    31.003 /    31.003 /    31.003
.E18 : 1123 :   /    28.003 /    28.003 /    28.003 /    28.003
.E19 : 1124 :   /    25.003 /    25.003 /    25.003 /    25.003
.E20 : 1125 :   /    22.002 /    22.002 /    22.002 /    22.002
.E21 : 1126 :   /    19.002 /    19.002 /    19.002 /    19.002
.E22 : 1127 :   /    16.002 /    16.002 /    16.002 /    16.002
.E23 : 1128 :   /    13.001 /    13.001 /    13.001 /    13.001
.E24 : 1129 :   /    12.001 /    12.001 /    12.001 /    12.001
.E25 : 1130 :   /    12.001 /    12.001 /    12.001 /    12.001
.E26 : 1201 :   /    12.001 /    12.001 /    12.001 /    12.001
.E27 : 1202 :   /    12.001 /    12.001 /    12.001 /    12.001
.E28 : 1203 :   /    12.001 /    12.001 /    12.001 /    12.001
.E29 : 1204 :   /    12.001

:

:________________________________________________________________

:BAGNELL DAM, MO - OSAGE RIVER     HSA - SGF
:LATEST ESTIMATED  TOTAL OUTFLOW 1.238 KCFS AT 1200Z ON NOV 06


:
.ER LKSM7REL 20241106 Z DC202411061505/DH18/QTIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /     1.000 /     1.000 /     1.000
.E2  : 1107 :   /     1.000 /     1.000 /     1.000 /     1.000
.E3  : 1108 :   /     1.100 /     1.100 /     1.100 /     1.100
.E4  : 1109 :   /     1.200 /     1.200 /     1.200 /     1.200
.E5  : 1110 :   /     1.300 /     1.300 /     1.300 /     1.300
.E6  : 1111 :   /     1.400 /     1.400 /     1.400 /     1.400
.E7  : 1112 :   /     1.000 /     1.000 /     1.000 /     1.000
.E8  : 1113 :   /     1.000 /     1.000 /     1.000 /     1.000
.E9  : 1114 :   /     1.000 /     1.000 /     1.000 /     1.000
.E10 : 1115 :   /     1.000 /     1.000 /     1.000 /     1.000
.E11 : 1116 :   /     1.000 /     1.000 /     1.000 /     1.000
.E12 : 1117 :   /     1.000 /     1.000 /     1.000 /     1.000
.E13 : 1118 :   /     1.000 /     1.000 /     1.000 /     1.000
.E14 : 1119 :   /     1.000 /     1.000 /     1.000 /     1.000
.E15 : 1120 :   /     1.000 /     1.000 /     1.000 /     1.000
.E16 : 1121 :   /     1.000 /     1.000 /     1.000 /     1.000
.E17 : 1122 :   /     1.000 /     1.000 /     1.000 /     1.000
.E18 : 1123 :   /     1.000 /     1.000 /     1.000 /     1.000
.E19 : 1124 :   /     1.000 /     1.000 /     1.000 /     1.000
.E20 : 1125 :   /     1.000 /     1.000 /     1.000 /     1.000
.E21 : 1126 :   /     1.000 /     1.000 /     1.000 /     1.000
.E22 : 1127 :   /     1.000 /     1.000 /     1.000 /     1.000
.E23 : 1128 :   /     1.000 /     1.000 /     1.000 /     1.000
.E24 : 1129 :   /     1.000 /     1.000 /     1.000 /     1.000
.E25 : 1130 :   /     1.000 /     1.000 /     1.000 /     1.000
.E26 : 1201 :   /     1.000 /     1.000 /     1.000 /     1.000
.E27 : 1202 :   /     1.000 /     1.000 /     1.000 /     1.000
.E28 : 1203 :   /     1.000 /     1.000 /     1.000 /     1.000
.E29 : 1204 :   /     1.000

:

:________________________________________________________________

:SOUTH SIOUX CITY, NE - MISSOURI RIVER     HSA - FSD
:MINOR FLOOD STAGE    30.0 FT FCST ISSUANCE STAGE  25.0 FT
:MODERATE FLOOD STAGE 33.0 FT MAJOR FLOOD STAGE    36.0 FT
:LATEST  RIVER STAGE 12.4 FT AT 1400Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      12.7 /      12.6 /      12.5 /      12.4

:
.ER SSCN1  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      12.4 /      12.4 /      12.4
.E2  : 1107 :   /      12.4 /      12.4 /      12.4 /      12.4
.E3  : 1108 :   /      12.4 /      12.4 /      12.4 /      12.4
.E4  : 1109 :   /      12.4 /      12.4 /      12.4 /      12.4
.E5  : 1110 :   /      12.4 /      12.4 /      12.4 /      12.4
.E6  : 1111 :   /      12.4 /      12.4 /      12.4 /      12.4
.E7  : 1112 :   /      12.4 /      12.4 /      12.4 /      12.4
.E8  : 1113 :   /      12.4 /      12.4 /      12.4 /      12.4
.E9  : 1114 :   /      12.4 /      12.5 /      12.5 /      12.5
.E10 : 1115 :   /      12.5 /      12.5 /      12.5 /      12.5
.E11 : 1116 :   /      12.5 /      12.5 /      12.5 /      12.5
.E12 : 1117 :   /      12.5 /      12.5 /      12.5 /      12.5
.E13 : 1118 :   /      12.5 /      12.5 /      12.5 /      12.5
.E14 : 1119 :   /      12.5 /      12.5 /      12.5 /      12.5
.E15 : 1120 :   /      12.6 /      12.8 /      12.9 /      12.9
.E16 : 1121 :   /      12.9 /      12.9 /      12.9 /      12.9
.E17 : 1122 :   /      12.9 /      12.9 /      12.9 /      12.8
.E18 : 1123 :   /      12.5 /      12.2 /      12.1 /      12.0
.E19 : 1124 :   /      11.7 /      11.3 /      11.2 /      11.1
.E20 : 1125 :   /      10.7 /      10.3 /      10.2 /      10.1
.E21 : 1126 :   /       9.7 /       9.3 /       9.1 /       9.0
.E22 : 1127 :   /       8.6 /       8.2 /       8.0 /       7.9
.E23 : 1128 :   /       7.5 /       7.0 /       6.8 /       6.7
.E24 : 1129 :   /       6.2 /       5.7 /       5.5 /       5.4
.E25 : 1130 :   /       5.3 /       5.1 /       5.0 /       5.0
.E26 : 1201 :   /       5.0 /       5.0 /       5.0 /       5.0
.E27 : 1202 :   /       5.0 /       5.0 /       5.0 /       5.0
.E28 : 1203 :   /       5.0 /       5.0 /       5.0 /       5.0
.E29 : 1204 :   /       5.0

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.11 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.11 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:SOUTH SIOUX CITY, NE - MISSOURI RIVER     HSA - FSD
:LATEST ESTIMATED  RIVER DISCHARGE 33.602 KCFS AT 1200Z ON NOV 06


:
.ER SSCN1  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    33.505 /    33.493 /    33.493
.E2  : 1107 :   /    33.493 /    33.494 /    33.514 /    33.536
.E3  : 1108 :   /    33.558 /    33.550 /    33.543 /    33.534
.E4  : 1109 :   /    33.525 /    33.514 /    33.503 /    33.491
.E5  : 1110 :   /    33.481 /    33.473 /    33.467 /    33.463
.E6  : 1111 :   /    33.461 /    33.461 /    33.461 /    33.462
.E7  : 1112 :   /    33.462 /    33.462 /    33.462 /    33.461
.E8  : 1113 :   /    33.461 /    33.460 /    33.459 /    33.458
.E9  : 1114 :   /    33.500 /    33.683 /    33.884 /    33.947
.E10 : 1115 :   /    33.948 /    33.946 /    33.943 /    33.940
.E11 : 1116 :   /    33.937 /    33.934 /    33.930 /    33.926
.E12 : 1117 :   /    33.923 /    33.919 /    33.915 /    33.911
.E13 : 1118 :   /    33.908 /    33.904 /    33.900 /    33.896
.E14 : 1119 :   /    33.891 /    33.887 /    33.882 /    33.878
.E15 : 1120 :   /    34.181 /    34.826 /    35.259 /    35.352
.E16 : 1121 :   /    35.349 /    35.343 /    35.337 /    35.331
.E17 : 1122 :   /    35.325 /    35.319 /    35.313 /    34.875
.E18 : 1123 :   /    33.667 /    32.609 /    32.304 /    32.021
.E19 : 1124 :   /    30.905 /    29.684 /    29.288 /    28.997
.E20 : 1125 :   /    27.880 /    26.659 /    26.263 /    25.972
.E21 : 1126 :   /    24.857 /    23.636 /    23.240 /    22.950
.E22 : 1127 :   /    21.834 /    20.613 /    20.218 /    19.927
.E23 : 1128 :   /    18.812 /    17.592 /    17.196 /    16.906
.E24 : 1129 :   /    15.791 /    14.571 /    14.176 /    14.061
.E25 : 1130 :   /    13.686 /    13.276 /    13.141 /    13.128
.E26 : 1201 :   /    13.123 /    13.119 /    13.114 /    13.109
.E27 : 1202 :   /    13.104 /    13.100 /    13.095 /    13.090
.E28 : 1203 :   /    13.086 /    13.081 /    13.076 /    13.072
.E29 : 1204 :   /    13.067

:

:________________________________________________________________

:OMAHA, NE - MISSOURI RIVER     HSA - OAX
:MINOR FLOOD STAGE    27.0 FT FCST ISSUANCE STAGE  21.0 FT
:MODERATE FLOOD STAGE 32.0 FT MAJOR FLOOD STAGE    40.0 FT
:LATEST  RIVER STAGE 16.0 FT AT 1500Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      16.0 /      16.0 /      16.0 /      16.0

:
.ER OMHN1  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      16.0 /      15.9 /      15.9
.E2  : 1107 :   /      15.9 /      15.8 /      15.7 /      15.6
.E3  : 1108 :   /      15.5 /      15.5 /      15.5 /      15.5
.E4  : 1109 :   /      15.5 /      15.5 /      15.5 /      15.5
.E5  : 1110 :   /      15.5 /      15.5 /      15.5 /      15.5
.E6  : 1111 :   /      15.4 /      15.4 /      15.4 /      15.4
.E7  : 1112 :   /      15.4 /      15.4 /      15.4 /      15.4
.E8  : 1113 :   /      15.4 /      15.4 /      15.4 /      15.4
.E9  : 1114 :   /      15.4 /      15.4 /      15.4 /      15.4
.E10 : 1115 :   /      15.4 /      15.4 /      15.4 /      15.4
.E11 : 1116 :   /      15.5 /      15.5 /      15.5 /      15.5
.E12 : 1117 :   /      15.6 /      15.6 /      15.5 /      15.5
.E13 : 1118 :   /      15.5 /      15.5 /      15.5 /      15.5
.E14 : 1119 :   /      15.5 /      15.5 /      15.5 /      15.5
.E15 : 1120 :   /      15.5 /      15.5 /      15.5 /      15.5
.E16 : 1121 :   /      15.5 /      15.5 /      15.6 /      15.7
.E17 : 1122 :   /      15.8 /      15.9 /      16.0 /      16.0
.E18 : 1123 :   /      16.0 /      16.0 /      16.0 /      16.0
.E19 : 1124 :   /      16.0 /      15.9 /      15.7 /      15.4
.E20 : 1125 :   /      15.2 /      14.9 /      14.7 /      14.4
.E21 : 1126 :   /      14.1 /      13.9 /      13.6 /      13.3
.E22 : 1127 :   /      13.0 /      12.8 /      12.5 /      12.2
.E23 : 1128 :   /      11.9 /      11.7 /      11.4 /      11.1
.E24 : 1129 :   /      10.8 /      10.6 /      10.4 /      10.1
.E25 : 1130 :   /       9.8 /       9.6 /       9.3 /       9.0
.E26 : 1201 :   /       8.7 /       8.5 /       8.3 /       8.2
.E27 : 1202 :   /       8.1 /       8.0 /       7.9 /       7.9
.E28 : 1203 :   /       7.9 /       7.9 /       7.9 /       7.9
.E29 : 1204 :   /       7.9

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.38 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 15Z is 0.38 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:OMAHA, NE - MISSOURI RIVER     HSA - OAX
:LATEST ESTIMATED  RIVER DISCHARGE 36.681 KCFS AT 1200Z ON NOV 06


:
.ER OMHN1  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    36.597 /    36.499 /    36.408
.E2  : 1107 :   /    36.288 /    36.025 /    35.756 /    35.521
.E3  : 1108 :   /    35.361 /    35.270 /    35.222 /    35.199
.E4  : 1109 :   /    35.192 /    35.198 /    35.208 /    35.214
.E5  : 1110 :   /    35.208 /    35.193 /    35.175 /    35.156
.E6  : 1111 :   /    35.138 /    35.122 /    35.107 /    35.093
.E7  : 1112 :   /    35.082 /    35.072 /    35.063 /    35.055
.E8  : 1113 :   /    35.048 /    35.040 /    35.032 /    35.024
.E9  : 1114 :   /    35.015 /    35.007 /    35.000 /    34.993
.E10 : 1115 :   /    34.987 /    34.989 /    35.016 /    35.088
.E11 : 1116 :   /    35.201 /    35.317 /    35.394 /    35.427
.E12 : 1117 :   /    35.434 /    35.430 /    35.424 /    35.418
.E13 : 1118 :   /    35.412 /    35.405 /    35.399 /    35.392
.E14 : 1119 :   /    35.386 /    35.380 /    35.373 /    35.367
.E15 : 1120 :   /    35.361 /    35.355 /    35.348 /    35.342
.E16 : 1121 :   /    35.342 /    35.380 /    35.519 /    35.803
.E17 : 1122 :   /    36.172 /    36.491 /    36.680 /    36.754
.E18 : 1123 :   /    36.769 /    36.765 /    36.757 /    36.739
.E19 : 1124 :   /    36.663 /    36.412 /    35.879 /    35.130
.E20 : 1125 :   /    34.381 /    33.727 /    33.047 /    32.252
.E21 : 1126 :   /    31.455 /    30.748 /    30.033 /    29.224
.E22 : 1127 :   /    28.424 /    27.716 /    27.002 /    26.193
.E23 : 1128 :   /    25.393 /    24.686 /    23.971 /    23.163
.E24 : 1129 :   /    22.370 /    21.699 /    21.105 /    20.441
.E25 : 1130 :   /    19.635 /    18.942 /    18.243 /    17.437
.E26 : 1201 :   /    16.631 /    15.993 /    15.534 /    15.173
.E27 : 1202 :   /    14.876 /    14.666 /    14.549 /    14.498
.E28 : 1203 :   /    14.480 /    14.471 /    14.465 /    14.459
.E29 : 1204 :   /    14.453

:

:________________________________________________________________

:NEBRASKA CITY 2 NNW, NE - MISSOURI RIVER     HSA - OAX
:MINOR FLOOD STAGE    18.0 FT FCST ISSUANCE STAGE  17.0 FT
:MODERATE FLOOD STAGE 23.0 FT MAJOR FLOOD STAGE    27.0 FT
:LATEST  RIVER STAGE 11.0 FT AT 1500Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      10.9 /      11.0 /      11.0 /      11.0

:
.ER NEBN1  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      11.0 /      11.0 /      10.8
.E2  : 1107 :   /      10.8 /      10.7 /      10.5 /      10.4
.E3  : 1108 :   /      10.3 /      10.4 /      10.3 /      10.3
.E4  : 1109 :   /      10.3 /      10.4 /      10.3 /      10.2
.E5  : 1110 :   /      10.3 /      10.3 /      10.2 /      10.2
.E6  : 1111 :   /      10.2 /      10.2 /      10.2 /      10.1
.E7  : 1112 :   /      10.2 /      10.2 /      10.2 /      10.1
.E8  : 1113 :   /      10.1 /      10.2 /      10.1 /      10.1
.E9  : 1114 :   /      10.1 /      10.2 /      10.1 /      10.1
.E10 : 1115 :   /      10.1 /      10.2 /      10.1 /      10.1
.E11 : 1116 :   /      10.1 /      10.2 /      10.2 /      10.2
.E12 : 1117 :   /      10.2 /      10.3 /      10.3 /      10.2
.E13 : 1118 :   /      10.3 /      10.4 /      10.3 /      10.3
.E14 : 1119 :   /      10.4 /      10.4 /      10.4 /      10.3
.E15 : 1120 :   /      10.4 /      10.4 /      10.4 /      10.3
.E16 : 1121 :   /      10.4 /      10.4 /      10.4 /      10.3
.E17 : 1122 :   /      10.4 /      10.6 /      10.6 /      10.6
.E18 : 1123 :   /      10.7 /      10.8 /      10.7 /      10.7
.E19 : 1124 :   /      10.7 /      10.8 /      10.7 /      10.5
.E20 : 1125 :   /      10.4 /      10.3 /      10.0 /       9.8
.E21 : 1126 :   /       9.7 /       9.5 /       9.3 /       9.0
.E22 : 1127 :   /       8.9 /       8.7 /       8.5 /       8.3
.E23 : 1128 :   /       8.1 /       8.0 /       7.7 /       7.5
.E24 : 1129 :   /       7.3 /       7.2 /       6.9 /       6.7
.E25 : 1130 :   /       6.6 /       6.4 /       6.2 /       6.0
.E26 : 1201 :   /       5.8 /       5.7 /       5.6 /       5.4
.E27 : 1202 :   /       5.2 /       5.2 /       5.1 /       5.0
.E28 : 1203 :   /       5.0 /       5.0 /       5.0 /       5.0
.E29 : 1204 :   /       5.0

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.03 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 15Z is 0.03 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:NEBRASKA CITY 2 NNW, NE - MISSOURI RIVER     HSA - OAX
:LATEST ESTIMATED  RIVER DISCHARGE 42.375 KCFS AT 1200Z ON NOV 06


:
.ER NEBN1  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    42.282 /    42.062 /    41.543
.E2  : 1107 :   /    41.298 /    41.083 /    40.486 /    39.815
.E3  : 1108 :   /    39.673 /    39.786 /    39.649 /    39.496
.E4  : 1109 :   /    39.670 /    39.778 /    39.471 /    39.201
.E5  : 1110 :   /    39.376 /    39.570 /    39.314 /    38.994
.E6  : 1111 :   /    39.097 /    39.286 /    39.095 /    38.841
.E7  : 1112 :   /    38.970 /    39.161 /    38.973 /    38.727
.E8  : 1113 :   /    38.869 /    39.079 /    38.906 /    38.669
.E9  : 1114 :   /    38.821 /    39.044 /    38.878 /    38.641
.E10 : 1115 :   /    38.790 /    39.007 /    38.838 /    38.614
.E11 : 1116 :   /    38.812 /    39.126 /    39.084 /    38.971
.E12 : 1117 :   /    39.227 /    39.533 /    39.452 /    39.329
.E13 : 1118 :   /    39.599 /    39.882 /    39.737 /    39.553
.E14 : 1119 :   /    39.766 /    39.987 /    39.792 /    39.581
.E15 : 1120 :   /    39.779 /    39.987 /    39.782 /    39.566
.E16 : 1121 :   /    39.762 /    39.970 /    39.785 /    39.652
.E17 : 1122 :   /    40.051 /    40.581 /    40.729 /    40.786
.E18 : 1123 :   /    41.131 /    41.392 /    41.197 /    40.980
.E19 : 1124 :   /    41.169 /    41.337 /    40.988 /    40.413
.E20 : 1125 :   /    39.995 /    39.456 /    38.543 /    37.668
.E21 : 1126 :   /    37.144 /    36.559 /    35.596 /    34.677
.E22 : 1127 :   /    34.131 /    33.537 /    32.570 /    31.649
.E23 : 1128 :   /    31.101 /    30.507 /    29.537 /    28.602
.E24 : 1129 :   /    28.025 /    27.390 /    26.380 /    25.442
.E25 : 1130 :   /    24.931 /    24.365 /    23.374 /    22.422
.E26 : 1201 :   /    21.837 /    21.476 /    20.944 /    20.068
.E27 : 1202 :   /    19.440 /    19.248 /    19.035 /    18.593
.E28 : 1203 :   /    18.341 /    18.471 /    18.543 /    18.325
.E29 : 1204 :   /    18.214

:

:________________________________________________________________

:BROWNVILLE, NE - MISSOURI RIVER     HSA - OAX
:MINOR FLOOD STAGE    34.0 FT FCST ISSUANCE STAGE  33.0 FT
:MODERATE FLOOD STAGE 38.5 FT MAJOR FLOOD STAGE    43.0 FT
:LATEST  RIVER STAGE 25.8 FT AT 1415Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      25.6 /      25.6 /      25.7 /      25.8

:
.ER BRON1  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      25.8 /      25.7 /      25.7
.E2  : 1107 :   /      25.6 /      25.5 /      25.5 /      25.3
.E3  : 1108 :   /      25.3 /      25.2 /      25.2 /      25.2
.E4  : 1109 :   /      25.2 /      25.2 /      25.2 /      25.1
.E5  : 1110 :   /      25.1 /      25.1 /      25.1 /      25.1
.E6  : 1111 :   /      25.1 /      25.1 /      25.0 /      25.0
.E7  : 1112 :   /      25.0 /      25.0 /      25.0 /      25.0
.E8  : 1113 :   /      25.0 /      25.0 /      25.0 /      25.0
.E9  : 1114 :   /      25.0 /      25.0 /      25.0 /      25.0
.E10 : 1115 :   /      25.0 /      25.0 /      25.0 /      25.0
.E11 : 1116 :   /      25.0 /      25.0 /      25.0 /      25.0
.E12 : 1117 :   /      25.0 /      25.1 /      25.1 /      25.1
.E13 : 1118 :   /      25.1 /      25.1 /      25.2 /      25.2
.E14 : 1119 :   /      25.2 /      25.2 /      25.2 /      25.2
.E15 : 1120 :   /      25.2 /      25.2 /      25.2 /      25.2
.E16 : 1121 :   /      25.2 /      25.2 /      25.2 /      25.2
.E17 : 1122 :   /      25.2 /      25.2 /      25.3 /      25.4
.E18 : 1123 :   /      25.4 /      25.5 /      25.5 /      25.5
.E19 : 1124 :   /      25.5 /      25.5 /      25.5 /      25.4
.E20 : 1125 :   /      25.3 /      25.2 /      25.1 /      24.9
.E21 : 1126 :   /      24.7 /      24.6 /      24.4 /      24.2
.E22 : 1127 :   /      24.0 /      23.8 /      23.6 /      23.4
.E23 : 1128 :   /      23.2 /      23.0 /      22.8 /      22.6
.E24 : 1129 :   /      22.4 /      22.2 /      22.0 /      21.7
.E25 : 1130 :   /      21.5 /      21.3 /      21.1 /      20.8
.E26 : 1201 :   /      20.5 /      20.3 /      20.2 /      20.0
.E27 : 1202 :   /      19.7 /      19.6 /      19.4 /      19.3
.E28 : 1203 :   /      19.2 /      19.1 /      19.1 /      19.1
.E29 : 1204 :   /      19.1

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.00 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.00 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:RULO, NE - MISSOURI RIVER     HSA - OAX
:MINOR FLOOD STAGE    17.0 FT FCST ISSUANCE STAGE  16.0 FT
:MODERATE FLOOD STAGE 21.0 FT MAJOR FLOOD STAGE    26.0 FT
:LATEST  RIVER STAGE 8.7 FT AT 1430Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       8.6 /       8.6 /       8.6 /       8.7

:
.ER RULN1  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       8.7 /       8.7 /       8.7
.E2  : 1107 :   /       8.7 /       8.6 /       8.6 /       8.5
.E3  : 1108 :   /       8.4 /       8.3 /       8.3 /       8.2
.E4  : 1109 :   /       8.2 /       8.2 /       8.2 /       8.2
.E5  : 1110 :   /       8.2 /       8.2 /       8.1 /       8.1
.E6  : 1111 :   /       8.1 /       8.1 /       8.1 /       8.1
.E7  : 1112 :   /       8.1 /       8.1 /       8.1 /       8.1
.E8  : 1113 :   /       8.0 /       8.0 /       8.0 /       8.0
.E9  : 1114 :   /       8.0 /       8.0 /       8.0 /       8.0
.E10 : 1115 :   /       8.0 /       8.0 /       8.0 /       8.0
.E11 : 1116 :   /       8.0 /       8.0 /       8.0 /       8.0
.E12 : 1117 :   /       8.0 /       8.1 /       8.1 /       8.1
.E13 : 1118 :   /       8.1 /       8.1 /       8.1 /       8.2
.E14 : 1119 :   /       8.2 /       8.2 /       8.2 /       8.2
.E15 : 1120 :   /       8.2 /       8.2 /       8.2 /       8.2
.E16 : 1121 :   /       8.2 /       8.2 /       8.2 /       8.2
.E17 : 1122 :   /       8.2 /       8.2 /       8.2 /       8.3
.E18 : 1123 :   /       8.3 /       8.4 /       8.4 /       8.4
.E19 : 1124 :   /       8.5 /       8.5 /       8.5 /       8.4
.E20 : 1125 :   /       8.4 /       8.4 /       8.3 /       8.2
.E21 : 1126 :   /       8.0 /       7.9 /       7.7 /       7.6
.E22 : 1127 :   /       7.5 /       7.3 /       7.2 /       7.0
.E23 : 1128 :   /       6.8 /       6.7 /       6.5 /       6.4
.E24 : 1129 :   /       6.2 /       6.1 /       5.9 /       5.8
.E25 : 1130 :   /       5.6 /       5.4 /       5.3 /       5.1
.E26 : 1201 :   /       4.9 /       4.7 /       4.6 /       4.5
.E27 : 1202 :   /       4.3 /       4.2 /       4.1 /       4.0
.E28 : 1203 :   /       3.9 /       3.8 /       3.7 /       3.7
.E29 : 1204 :   /       3.7

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.00 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.00 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:RULO, NE - MISSOURI RIVER     HSA - OAX
:LATEST ESTIMATED  RIVER DISCHARGE 43.469 KCFS AT 1200Z ON NOV 06


:
.ER RULN1  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    43.616 /    43.699 /    43.650
.E2  : 1107 :   /    43.460 /    43.198 /    42.864 /    42.492
.E3  : 1108 :   /    42.078 /    41.656 /    41.305 /    41.072
.E4  : 1109 :   /    40.948 /    40.894 /    40.872 /    40.844
.E5  : 1110 :   /    40.787 /    40.716 /    40.658 /    40.615
.E6  : 1111 :   /    40.561 /    40.487 /    40.417 /    40.364
.E7  : 1112 :   /    40.318 /    40.271 /    40.233 /    40.206
.E8  : 1113 :   /    40.176 /    40.140 /    40.113 /    40.098
.E9  : 1114 :   /    40.082 /    40.059 /    40.044 /    40.040
.E10 : 1115 :   /    40.032 /    40.013 /    39.999 /    39.994
.E11 : 1116 :   /    39.989 /    39.986 /    40.008 /    40.067
.E12 : 1117 :   /    40.146 /    40.230 /    40.323 /    40.423
.E13 : 1118 :   /    40.515 /    40.595 /    40.675 /    40.754
.E14 : 1119 :   /    40.813 /    40.847 /    40.872 /    40.896
.E15 : 1120 :   /    40.905 /    40.899 /    40.896 /    40.900
.E16 : 1121 :   /    40.896 /    40.882 /    40.875 /    40.885
.E17 : 1122 :   /    40.910 /    40.969 /    41.101 /    41.311
.E18 : 1123 :   /    41.562 /    41.806 /    42.012 /    42.160
.E19 : 1124 :   /    42.234 /    42.251 /    42.237 /    42.183
.E20 : 1125 :   /    42.037 /    41.752 /    41.323 /    40.768
.E21 : 1126 :   /    40.117 /    39.410 /    38.688 /    37.959
.E22 : 1127 :   /    37.214 /    36.454 /    35.698 /    34.948
.E23 : 1128 :   /    34.189 /    33.423 /    32.663 /    31.910
.E24 : 1129 :   /    31.146 /    30.368 /    29.589 /    28.811
.E25 : 1130 :   /    28.025 /    27.241 /    26.607 /    25.648
.E26 : 1201 :   /    24.660 /    23.846 /    23.181 /    22.615
.E27 : 1202 :   /    22.003 /    21.362 /    20.822 /    20.412
.E28 : 1203 :   /    20.060 /    19.759 /    19.580 /    19.510
.E29 : 1204 :   /    19.450

:

:________________________________________________________________

:ST JOSEPH, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    17.0 FT FCST ISSUANCE STAGE  13.5 FT
:MODERATE FLOOD STAGE 21.0 FT MAJOR FLOOD STAGE    27.0 FT
:LATEST  RIVER STAGE 8.0 FT AT 1435Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       8.2 /       8.1 /       8.0 /       8.0

:
.ER SJSM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       8.0 /       8.0 /       8.0
.E2  : 1107 :   /       8.0 /       8.0 /       7.9 /       7.8
.E3  : 1108 :   /       7.7 /       7.7 /       7.6 /       7.5
.E4  : 1109 :   /       7.4 /       7.4 /       7.3 /       7.3
.E5  : 1110 :   /       7.3 /       7.3 /       7.3 /       7.3
.E6  : 1111 :   /       7.3 /       7.3 /       7.2 /       7.2
.E7  : 1112 :   /       7.2 /       7.2 /       7.2 /       7.2
.E8  : 1113 :   /       7.2 /       7.2 /       7.2 /       7.2
.E9  : 1114 :   /       7.1 /       7.1 /       7.1 /       7.1
.E10 : 1115 :   /       7.1 /       7.1 /       7.1 /       7.1
.E11 : 1116 :   /       7.1 /       7.1 /       7.1 /       7.1
.E12 : 1117 :   /       7.1 /       7.1 /       7.2 /       7.2
.E13 : 1118 :   /       7.2 /       7.2 /       7.2 /       7.2
.E14 : 1119 :   /       7.3 /       7.3 /       7.3 /       7.3
.E15 : 1120 :   /       7.3 /       7.3 /       7.3 /       7.3
.E16 : 1121 :   /       7.3 /       7.3 /       7.3 /       7.3
.E17 : 1122 :   /       7.3 /       7.3 /       7.3 /       7.3
.E18 : 1123 :   /       7.4 /       7.4 /       7.5 /       7.5
.E19 : 1124 :   /       7.5 /       7.6 /       7.6 /       7.6
.E20 : 1125 :   /       7.6 /       7.6 /       7.5 /       7.4
.E21 : 1126 :   /       7.3 /       7.2 /       7.1 /       6.9
.E22 : 1127 :   /       6.7 /       6.6 /       6.4 /       6.2
.E23 : 1128 :   /       6.1 /       5.9 /       5.7 /       5.5
.E24 : 1129 :   /       5.3 /       5.1 /       4.9 /       4.7
.E25 : 1130 :   /       4.6 /       4.4 /       4.2 /       4.0
.E26 : 1201 :   /       3.8 /       3.6 /       3.3 /       3.1
.E27 : 1202 :   /       2.9 /       2.7 /       2.5 /       2.3
.E28 : 1203 :   /       2.1 /       2.0 /       1.8 /       1.7
.E29 : 1204 :   /       1.7

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.00 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.00 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:ST JOSEPH, MO - MISSOURI RIVER     HSA - EAX
:LATEST  RIVER DISCHARGE 45.700 KCFS AT 1335Z ON NOV 06


:
.ER SJSM7  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    44.698 /    44.748 /    44.714
.E2  : 1107 :   /    44.616 /    44.435 /    44.176 /    43.830
.E3  : 1108 :   /    43.445 /    43.033 /    42.608 /    42.215
.E4  : 1109 :   /    41.907 /    41.705 /    41.594 /    41.539
.E5  : 1110 :   /    41.503 /    41.455 /    41.388 /    41.319
.E6  : 1111 :   /    41.261 /    41.207 /    41.141 /    41.067
.E7  : 1112 :   /    41.000 /    40.946 /    40.895 /    40.849
.E8  : 1113 :   /    40.812 /    40.780 /    40.745 /    40.710
.E9  : 1114 :   /    40.685 /    40.665 /    40.643 /    40.622
.E10 : 1115 :   /    40.608 /    40.598 /    40.583 /    40.565
.E11 : 1116 :   /    40.552 /    40.544 /    40.537 /    40.543
.E12 : 1117 :   /    40.577 /    40.639 /    40.716 /    40.801
.E13 : 1118 :   /    40.894 /    40.988 /    41.073 /    41.152
.E14 : 1119 :   /    41.229 /    41.297 /    41.345 /    41.375
.E15 : 1120 :   /    41.399 /    41.414 /    41.416 /    41.411
.E16 : 1121 :   /    41.409 /    41.407 /    41.397 /    41.385
.E17 : 1122 :   /    41.383 /    41.397 /    41.434 /    41.520
.E18 : 1123 :   /    41.678 /    41.897 /    42.139 /    42.365
.E19 : 1124 :   /    42.547 /    42.666 /    42.720 /    42.727
.E20 : 1125 :   /    42.697 /    42.604 /    42.403 /    42.066
.E21 : 1126 :   /    41.593 /    41.005 /    40.337 /    39.628
.E22 : 1127 :   /    38.903 /    38.166 /    37.415 /    36.657
.E23 : 1128 :   /    35.901 /    35.146 /    34.383 /    33.619
.E24 : 1129 :   /    32.861 /    32.100 /    31.330 /    30.552
.E25 : 1130 :   /    30.115 /    29.495 /    28.790 /    28.006
.E26 : 1201 :   /    27.326 /    26.449 /    25.501 /    24.637
.E27 : 1202 :   /    23.908 /    23.297 /    22.687 /    22.058
.E28 : 1203 :   /    21.490 /    21.030 /    20.646 /    20.323
.E29 : 1204 :   /    20.101

:

:________________________________________________________________

:PARKVILLE 5 W, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    25.0 FT FCST ISSUANCE STAGE  22.0 FT
:MODERATE FLOOD STAGE 28.0 FT MAJOR FLOOD STAGE    35.0 FT
:LATEST  RIVER STAGE 10.6 FT AT 1445Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      10.8 /      10.9 /      10.8 /      10.7

:
.ER PKVM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      10.6 /      10.6 /      10.6
.E2  : 1107 :   /      10.5 /      10.5 /      10.5 /      10.5
.E3  : 1108 :   /      10.4 /      10.3 /      10.2 /      10.1
.E4  : 1109 :   /      10.0 /       9.9 /       9.9 /       9.8
.E5  : 1110 :   /       9.7 /       9.7 /       9.7 /       9.7
.E6  : 1111 :   /       9.7 /       9.7 /       9.6 /       9.6
.E7  : 1112 :   /       9.6 /       9.6 /       9.6 /       9.6
.E8  : 1113 :   /       9.6 /       9.5 /       9.5 /       9.5
.E9  : 1114 :   /       9.5 /       9.5 /       9.5 /       9.5
.E10 : 1115 :   /       9.5 /       9.5 /       9.5 /       9.5
.E11 : 1116 :   /       9.5 /       9.5 /       9.5 /       9.5
.E12 : 1117 :   /       9.5 /       9.5 /       9.5 /       9.5
.E13 : 1118 :   /       9.5 /       9.5 /       9.5 /       9.5
.E14 : 1119 :   /       9.5 /       9.6 /       9.6 /       9.6
.E15 : 1120 :   /       9.6 /       9.6 /       9.6 /       9.6
.E16 : 1121 :   /       9.6 /       9.6 /       9.6 /       9.6
.E17 : 1122 :   /       9.6 /       9.6 /       9.6 /       9.6
.E18 : 1123 :   /       9.6 /       9.6 /       9.7 /       9.7
.E19 : 1124 :   /       9.7 /       9.8 /       9.8 /       9.8
.E20 : 1125 :   /       9.9 /       9.9 /       9.9 /       9.9
.E21 : 1126 :   /       9.9 /       9.8 /       9.8 /       9.7
.E22 : 1127 :   /       9.6 /       9.4 /       9.3 /       9.2
.E23 : 1128 :   /       9.0 /       8.9 /       8.7 /       8.5
.E24 : 1129 :   /       8.4 /       8.2 /       8.0 /       7.9
.E25 : 1130 :   /       7.7 /       7.5 /       7.4 /       7.2
.E26 : 1201 :   /       7.1 /       6.9 /       6.8 /       6.6
.E27 : 1202 :   /       6.4 /       6.2 /       6.0 /       5.8
.E28 : 1203 :   /       5.6 /       5.4 /       5.3 /       5.1
.E29 : 1204 :   /       5.0

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.00 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.00 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:KANSAS CITY, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    32.0 FT FCST ISSUANCE STAGE  30.0 FT
:MODERATE FLOOD STAGE 35.0 FT MAJOR FLOOD STAGE    49.0 FT
:LATEST  RIVER STAGE 11.1 FT AT 1430Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      11.4 /      11.4 /      11.3 /      11.2

:
.ER KCDM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      11.1 /      11.1 /      11.1
.E2  : 1107 :   /      11.0 /      10.9 /      10.8 /      10.7
.E3  : 1108 :   /      10.6 /      10.6 /      10.5 /      10.4
.E4  : 1109 :   /      10.3 /      10.2 /      10.2 /      10.1
.E5  : 1110 :   /      10.0 /      10.0 /      10.0 /       9.9
.E6  : 1111 :   /       9.9 /       9.9 /       9.9 /       9.9
.E7  : 1112 :   /       9.9 /       9.9 /       9.8 /       9.8
.E8  : 1113 :   /       9.8 /       9.8 /       9.8 /       9.8
.E9  : 1114 :   /       9.8 /       9.8 /       9.8 /       9.8
.E10 : 1115 :   /       9.8 /       9.8 /       9.8 /       9.8
.E11 : 1116 :   /       9.8 /       9.8 /       9.8 /       9.7
.E12 : 1117 :   /       9.7 /       9.7 /       9.7 /       9.7
.E13 : 1118 :   /       9.8 /       9.8 /       9.8 /       9.8
.E14 : 1119 :   /       9.8 /       9.8 /       9.8 /       9.9
.E15 : 1120 :   /       9.9 /       9.9 /       9.9 /       9.9
.E16 : 1121 :   /       9.9 /       9.9 /       9.9 /       9.9
.E17 : 1122 :   /       9.9 /       9.9 /       9.9 /       9.9
.E18 : 1123 :   /       9.9 /       9.9 /       9.9 /       9.9
.E19 : 1124 :   /      10.0 /      10.0 /      10.1 /      10.1
.E20 : 1125 :   /      10.1 /      10.1 /      10.1 /      10.1
.E21 : 1126 :   /      10.1 /      10.1 /      10.1 /      10.0
.E22 : 1127 :   /       9.9 /       9.8 /       9.7 /       9.5
.E23 : 1128 :   /       9.4 /       9.2 /       9.0 /       8.9
.E24 : 1129 :   /       8.7 /       8.5 /       8.4 /       8.2
.E25 : 1130 :   /       8.0 /       7.8 /       7.6 /       7.5
.E26 : 1201 :   /       7.3 /       7.2 /       7.0 /       6.8
.E27 : 1202 :   /       6.6 /       6.4 /       6.2 /       5.9
.E28 : 1203 :   /       5.7 /       5.5 /       5.4 /       5.2
.E29 : 1204 :   /       5.0

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.00 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.00 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:KANSAS CITY, MO - MISSOURI RIVER     HSA - EAX
:LATEST ESTIMATED  RIVER DISCHARGE 49.439 KCFS AT 1200Z ON NOV 06


:
.ER KCDM7  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    48.791 /    48.992 /    49.012
.E2  : 1107 :   /    48.300 /    47.624 /    47.151 /    46.809
.E3  : 1108 :   /    46.453 /    46.036 /    45.577 /    45.097
.E4  : 1109 :   /    44.614 /    44.143 /    43.703 /    43.320
.E5  : 1110 :   /    43.015 /    42.795 /    42.650 /    42.557
.E6  : 1111 :   /    42.487 /    42.421 /    42.352 /    42.281
.E7  : 1112 :   /    42.211 /    42.140 /    42.070 /    42.006
.E8  : 1113 :   /    41.956 /    41.924 /    41.908 /    41.900
.E9  : 1114 :   /    41.893 /    41.880 /    41.861 /    41.837
.E10 : 1115 :   /    41.812 /    41.787 /    41.763 /    41.741
.E11 : 1116 :   /    41.721 /    41.702 /    41.683 /    41.665
.E12 : 1117 :   /    41.648 /    41.636 /    41.632 /    41.643
.E13 : 1118 :   /    41.675 /    41.726 /    41.794 /    41.873
.E14 : 1119 :   /    41.958 /    42.043 /    42.124 /    42.201
.E15 : 1120 :   /    42.270 /    42.328 /    42.373 /    42.405
.E16 : 1121 :   /    42.426 /    42.436 /    42.438 /    42.435
.E17 : 1122 :   /    42.429 /    42.421 /    42.411 /    42.404
.E18 : 1123 :   /    42.406 /    42.426 /    42.479 /    42.577
.E19 : 1124 :   /    42.727 /    42.920 /    43.130 /    43.329
.E20 : 1125 :   /    43.492 /    43.604 /    43.663 /    43.670
.E21 : 1126 :   /    43.618 /    43.490 /    43.262 /    42.917
.E22 : 1127 :   /    42.452 /    41.885 /    41.242 /    40.549
.E23 : 1128 :   /    39.828 /    39.089 /    38.340 /    37.585
.E24 : 1129 :   /    36.827 /    36.067 /    35.304 /    34.541
.E25 : 1130 :   /    33.777 /    33.014 /    32.283 /    31.610
.E26 : 1201 :   /    30.979 /    30.337 /    29.653 /    28.920
.E27 : 1202 :   /    28.134 /    27.297 /    26.441 /    25.626
.E28 : 1203 :   /    24.886 /    24.215 /    23.587 /    22.996
.E29 : 1204 :   /    22.459

:

:________________________________________________________________

:NAPOLEON, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    17.0 FT FCST ISSUANCE STAGE  15.0 FT
:MODERATE FLOOD STAGE 25.0 FT MAJOR FLOOD STAGE    30.0 FT
:LATEST  RIVER STAGE 8.4 FT AT 1400Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       8.5 /       8.6 /       8.5 /       8.4

:
.ER NAPM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       8.3 /       8.3 /       8.2
.E2  : 1107 :   /       8.2 /       8.2 /       8.1 /       8.0
.E3  : 1108 :   /       7.9 /       7.8 /       7.7 /       7.6
.E4  : 1109 :   /       7.6 /       7.5 /       7.4 /       7.3
.E5  : 1110 :   /       7.2 /       7.1 /       7.1 /       7.1
.E6  : 1111 :   /       7.0 /       7.0 /       7.0 /       7.0
.E7  : 1112 :   /       7.0 /       7.0 /       6.9 /       6.9
.E8  : 1113 :   /       6.9 /       6.9 /       6.9 /       6.9
.E9  : 1114 :   /       6.9 /       6.9 /       6.9 /       6.9
.E10 : 1115 :   /       6.9 /       6.9 /       6.9 /       6.9
.E11 : 1116 :   /       6.9 /       6.8 /       6.8 /       6.8
.E12 : 1117 :   /       6.8 /       6.8 /       6.8 /       6.8
.E13 : 1118 :   /       6.8 /       6.8 /       6.8 /       6.8
.E14 : 1119 :   /       6.9 /       6.9 /       6.9 /       6.9
.E15 : 1120 :   /       6.9 /       6.9 /       7.0 /       7.0
.E16 : 1121 :   /       7.0 /       7.0 /       7.0 /       7.0
.E17 : 1122 :   /       7.0 /       7.0 /       7.0 /       7.0
.E18 : 1123 :   /       7.0 /       7.0 /       7.0 /       7.0
.E19 : 1124 :   /       7.0 /       7.0 /       7.1 /       7.1
.E20 : 1125 :   /       7.1 /       7.2 /       7.2 /       7.2
.E21 : 1126 :   /       7.2 /       7.2 /       7.2 /       7.2
.E22 : 1127 :   /       7.1 /       7.0 /       6.9 /       6.8
.E23 : 1128 :   /       6.7 /       6.5 /       6.4 /       6.2
.E24 : 1129 :   /       6.1 /       5.9 /       5.8 /       5.6
.E25 : 1130 :   /       5.4 /       5.2 /       5.1 /       4.9
.E26 : 1201 :   /       4.7 /       4.6 /       4.4 /       4.2
.E27 : 1202 :   /       4.1 /       3.9 /       3.7 /       3.4
.E28 : 1203 :   /       3.2 /       3.0 /       2.8 /       2.6
.E29 : 1204 :   /       2.4

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.04 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.04 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:WAVERLY, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    20.0 FT FCST ISSUANCE STAGE  18.0 FT
:MODERATE FLOOD STAGE 29.0 FT MAJOR FLOOD STAGE    31.0 FT
:LATEST  RIVER STAGE 12.4 FT AT 1400Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      12.3 /      12.4 /      12.4 /      12.4

:
.ER WVYM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      12.3 /      12.3 /      12.2
.E2  : 1107 :   /      12.1 /      12.1 /      12.0 /      12.0
.E3  : 1108 :   /      11.9 /      11.8 /      11.7 /      11.6
.E4  : 1109 :   /      11.5 /      11.5 /      11.4 /      11.3
.E5  : 1110 :   /      11.2 /      11.1 /      11.1 /      11.0
.E6  : 1111 :   /      11.0 /      11.0 /      10.9 /      10.9
.E7  : 1112 :   /      10.9 /      10.9 /      10.9 /      10.9
.E8  : 1113 :   /      10.8 /      10.8 /      10.8 /      10.8
.E9  : 1114 :   /      10.8 /      10.8 /      10.8 /      10.8
.E10 : 1115 :   /      10.8 /      10.8 /      10.8 /      10.8
.E11 : 1116 :   /      10.8 /      10.8 /      10.8 /      10.8
.E12 : 1117 :   /      10.8 /      10.8 /      10.7 /      10.7
.E13 : 1118 :   /      10.7 /      10.7 /      10.7 /      10.8
.E14 : 1119 :   /      10.8 /      10.8 /      10.8 /      10.8
.E15 : 1120 :   /      10.8 /      10.8 /      10.8 /      10.9
.E16 : 1121 :   /      10.9 /      10.9 /      10.9 /      10.9
.E17 : 1122 :   /      10.9 /      10.9 /      10.9 /      10.9
.E18 : 1123 :   /      10.9 /      10.9 /      10.9 /      10.9
.E19 : 1124 :   /      10.9 /      10.9 /      10.9 /      11.0
.E20 : 1125 :   /      11.0 /      11.0 /      11.0 /      11.1
.E21 : 1126 :   /      11.1 /      11.1 /      11.1 /      11.1
.E22 : 1127 :   /      11.1 /      11.0 /      11.0 /      10.9
.E23 : 1128 :   /      10.8 /      10.7 /      10.5 /      10.4
.E24 : 1129 :   /      10.3 /      10.1 /      10.0 /       9.8
.E25 : 1130 :   /       9.7 /       9.5 /       9.3 /       9.2
.E26 : 1201 :   /       9.0 /       8.9 /       8.7 /       8.5
.E27 : 1202 :   /       8.4 /       8.3 /       8.2 /       8.1
.E28 : 1203 :   /       8.0 /       7.7 /       7.5 /       7.3
.E29 : 1204 :   /       7.1

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.03 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.03 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:WAVERLY, MO - MISSOURI RIVER     HSA - EAX
:LATEST ESTIMATED  RIVER DISCHARGE 51.432 KCFS AT 1200Z ON NOV 06


:
.ER WVYM7  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    51.071 /    50.582 /    50.140
.E2  : 1107 :   /    49.845 /    49.557 /    49.226 /    48.736
.E3  : 1108 :   /    48.154 /    47.610 /    47.147 /    46.723
.E4  : 1109 :   /    46.291 /    45.834 /    45.360 /    44.882
.E5  : 1110 :   /    44.418 /    43.987 /    43.608 /    43.297
.E6  : 1111 :   /    43.060 /    42.890 /    42.771 /    42.682
.E7  : 1112 :   /    42.607 /    42.535 /    42.464 /    42.392
.E8  : 1113 :   /    42.321 /    42.253 /    42.191 /    42.141
.E9  : 1114 :   /    42.105 /    42.082 /    42.067 /    42.054
.E10 : 1115 :   /    42.040 /    42.022 /    41.999 /    41.975
.E11 : 1116 :   /    41.950 /    41.925 /    41.902 /    41.881
.E12 : 1117 :   /    41.860 /    41.841 /    41.823 /    41.807
.E13 : 1118 :   /    41.796 /    41.795 /    41.807 /    41.837
.E14 : 1119 :   /    41.883 /    41.946 /    42.019 /    42.099
.E15 : 1120 :   /    42.180 /    42.260 /    42.335 /    42.402
.E16 : 1121 :   /    42.459 /    42.504 /    42.538 /    42.560
.E17 : 1122 :   /    42.572 /    42.576 /    42.575 /    42.570
.E18 : 1123 :   /    42.562 /    42.554 /    42.551 /    42.558
.E19 : 1124 :   /    42.585 /    42.643 /    42.740 /    42.879
.E20 : 1125 :   /    43.051 /    43.240 /    43.422 /    43.577
.E21 : 1126 :   /    43.690 /    43.752 /    43.759 /    43.701
.E22 : 1127 :   /    43.565 /    43.335 /    42.999 /    42.556
.E23 : 1128 :   /    42.016 /    41.398 /    40.725 /    40.016
.E24 : 1129 :   /    39.285 /    38.540 /    37.788 /    37.031
.E25 : 1130 :   /    36.271 /    35.509 /    34.746 /    33.987
.E26 : 1201 :   /    33.240 /    32.519 /    31.831 /    31.168
.E27 : 1202 :   /    30.542 /    30.015 /    29.703 /    29.330
.E28 : 1203 :   /    28.662 /    27.861 /    27.038 /    26.223
.E29 : 1204 :   /    25.449

:

:________________________________________________________________

:GLASGOW, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    25.0 FT FCST ISSUANCE STAGE  23.0 FT
:MODERATE FLOOD STAGE 27.0 FT MAJOR FLOOD STAGE    32.0 FT
:LATEST  RIVER STAGE 13.7 FT AT 1430Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      13.8 /      13.8 /      13.8 /      13.7

:
.ER GLZM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      13.6 /      13.5 /      13.3
.E2  : 1107 :   /      13.2 /      13.0 /      12.9 /      12.8
.E3  : 1108 :   /      12.6 /      12.5 /      12.4 /      12.3
.E4  : 1109 :   /      12.2 /      12.1 /      12.0 /      11.9
.E5  : 1110 :   /      11.8 /      11.7 /      11.6 /      11.5
.E6  : 1111 :   /      11.4 /      11.3 /      11.3 /      11.2
.E7  : 1112 :   /      11.2 /      11.2 /      11.1 /      11.1
.E8  : 1113 :   /      11.1 /      11.1 /      11.1 /      11.1
.E9  : 1114 :   /      11.1 /      11.0 /      11.0 /      11.0
.E10 : 1115 :   /      11.0 /      11.0 /      11.0 /      11.0
.E11 : 1116 :   /      11.0 /      11.0 /      11.0 /      11.0
.E12 : 1117 :   /      11.0 /      11.0 /      11.0 /      11.0
.E13 : 1118 :   /      11.0 /      11.0 /      11.0 /      11.0
.E14 : 1119 :   /      11.0 /      11.0 /      11.0 /      11.0
.E15 : 1120 :   /      11.0 /      11.0 /      11.0 /      11.0
.E16 : 1121 :   /      11.0 /      11.1 /      11.1 /      11.1
.E17 : 1122 :   /      11.1 /      11.1 /      11.1 /      11.1
.E18 : 1123 :   /      11.1 /      11.1 /      11.1 /      11.1
.E19 : 1124 :   /      11.1 /      11.1 /      11.1 /      11.1
.E20 : 1125 :   /      11.1 /      11.1 /      11.2 /      11.2
.E21 : 1126 :   /      11.2 /      11.3 /      11.3 /      11.3
.E22 : 1127 :   /      11.3 /      11.3 /      11.3 /      11.3
.E23 : 1128 :   /      11.2 /      11.2 /      11.1 /      11.0
.E24 : 1129 :   /      10.9 /      10.7 /      10.6 /      10.4
.E25 : 1130 :   /      10.3 /      10.1 /       9.9 /       9.8
.E26 : 1201 :   /       9.6 /       9.4 /       9.2 /       9.1
.E27 : 1202 :   /       8.9 /       8.7 /       8.5 /       8.4
.E28 : 1203 :   /       8.3 /       8.2 /       8.0 /       7.9
.E29 : 1204 :   /       7.7

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.10 /      0.10 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.20 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:BOONVILLE, MO - MISSOURI RIVER     HSA - EAX
:MINOR FLOOD STAGE    21.0 FT FCST ISSUANCE STAGE  19.0 FT
:MODERATE FLOOD STAGE 30.0 FT MAJOR FLOOD STAGE    34.0 FT
:LATEST  RIVER STAGE 10.5 FT AT 1404Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      10.2 /      10.5 /      10.6 /      10.6

:
.ER BOZM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      10.4 /      10.2 /      10.0
.E2  : 1107 :   /       9.7 /       9.5 /       9.3 /       9.1
.E3  : 1108 :   /       8.9 /       8.8 /       8.6 /       8.5
.E4  : 1109 :   /       8.3 /       8.2 /       8.1 /       8.1
.E5  : 1110 :   /       8.0 /       7.9 /       7.8 /       7.7
.E6  : 1111 :   /       7.6 /       7.5 /       7.4 /       7.3
.E7  : 1112 :   /       7.3 /       7.2 /       7.2 /       7.2
.E8  : 1113 :   /       7.1 /       7.1 /       7.1 /       7.1
.E9  : 1114 :   /       7.1 /       7.1 /       7.1 /       7.0
.E10 : 1115 :   /       7.0 /       7.0 /       7.0 /       7.0
.E11 : 1116 :   /       7.0 /       7.0 /       7.0 /       7.0
.E12 : 1117 :   /       7.0 /       7.0 /       7.0 /       7.0
.E13 : 1118 :   /       7.0 /       7.0 /       7.0 /       7.0
.E14 : 1119 :   /       7.0 /       7.0 /       7.0 /       7.0
.E15 : 1120 :   /       7.0 /       7.0 /       7.0 /       7.0
.E16 : 1121 :   /       7.0 /       7.0 /       7.0 /       7.1
.E17 : 1122 :   /       7.1 /       7.1 /       7.1 /       7.1
.E18 : 1123 :   /       7.1 /       7.1 /       7.1 /       7.1
.E19 : 1124 :   /       7.1 /       7.1 /       7.1 /       7.1
.E20 : 1125 :   /       7.1 /       7.1 /       7.1 /       7.1
.E21 : 1126 :   /       7.2 /       7.2 /       7.2 /       7.2
.E22 : 1127 :   /       7.3 /       7.3 /       7.3 /       7.3
.E23 : 1128 :   /       7.3 /       7.3 /       7.2 /       7.2
.E24 : 1129 :   /       7.1 /       7.0 /       6.9 /       6.7
.E25 : 1130 :   /       6.6 /       6.5 /       6.3 /       6.2
.E26 : 1201 :   /       6.0 /       5.8 /       5.7 /       5.5
.E27 : 1202 :   /       5.3 /       5.2 /       5.0 /       4.9
.E28 : 1203 :   /       4.7 /       4.6 /       4.4 /       4.3
.E29 : 1204 :   /       4.2

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.01 /      0.12 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.13 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:BOONVILLE, MO - MISSOURI RIVER     HSA - EAX
:LATEST ESTIMATED  RIVER DISCHARGE 64.634 KCFS AT 1200Z ON NOV 06


:
.ER BOZM7  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    63.457 /    62.030 /    60.465
.E2  : 1107 :   /    58.799 /    57.116 /    55.548 /    54.348
.E3  : 1108 :   /    53.378 /    52.481 /    51.565 /    50.680
.E4  : 1109 :   /    49.905 /    49.267 /    48.708 /    48.161
.E5  : 1110 :   /    47.648 /    47.192 /    46.742 /    46.242
.E6  : 1111 :   /    45.687 /    45.156 /    44.679 /    44.265
.E7  : 1112 :   /    43.921 /    43.648 /    43.440 /    43.286
.E8  : 1113 :   /    43.170 /    43.076 /    42.993 /    42.915
.E9  : 1114 :   /    42.838 /    42.764 /    42.694 /    42.631
.E10 : 1115 :   /    42.578 /    42.535 /    42.504 /    42.481
.E11 : 1116 :   /    42.461 /    42.442 /    42.421 /    42.397
.E12 : 1117 :   /    42.371 /    42.343 /    42.316 /    42.290
.E13 : 1118 :   /    42.266 /    42.242 /    42.220 /    42.200
.E14 : 1119 :   /    42.184 /    42.173 /    42.171 /    42.182
.E15 : 1120 :   /    42.208 /    42.249 /    42.304 /    42.370
.E16 : 1121 :   /    42.444 /    42.521 /    42.597 /    42.669
.E17 : 1122 :   /    42.734 /    42.791 /    42.837 /    42.871
.E18 : 1123 :   /    42.895 /    42.908 /    42.913 /    42.912
.E19 : 1124 :   /    42.907 /    42.899 /    42.893 /    42.892
.E20 : 1125 :   /    42.903 /    42.934 /    42.992 /    43.085
.E21 : 1126 :   /    43.211 /    43.365 /    43.534 /    43.699
.E22 : 1127 :   /    43.843 /    43.951 /    44.011 /    44.014
.E23 : 1128 :   /    43.951 /    43.810 /    43.580 /    43.252
.E24 : 1129 :   /    42.825 /    42.307 /    41.711 /    41.057
.E25 : 1130 :   /    40.361 /    39.637 /    38.897 /    38.147
.E26 : 1201 :   /    37.390 /    36.629 /    35.867 /    35.107
.E27 : 1202 :   /    34.352 /    33.611 /    32.891 /    32.198
.E28 : 1203 :   /    31.546 /    30.955 /    30.438 /    29.970
.E29 : 1204 :   /    29.477

:

:________________________________________________________________

:JEFFERSON CITY, MO - MISSOURI RIVER     HSA - LSX
:MINOR FLOOD STAGE    23.0 FT FCST ISSUANCE STAGE  21.0 FT
:MODERATE FLOOD STAGE 25.0 FT MAJOR FLOOD STAGE    30.0 FT
:LATEST  RIVER STAGE 9.4 FT AT 1445Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       8.8 /       8.9 /       9.1 /       9.4

:
.ER JFFM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       9.6 /       9.6 /       9.6
.E2  : 1107 :   /       9.5 /       9.3 /       9.0 /       8.7
.E3  : 1108 :   /       8.4 /       8.1 /       7.9 /       7.6
.E4  : 1109 :   /       7.5 /       7.3 /       7.1 /       7.0
.E5  : 1110 :   /       6.8 /       6.7 /       6.6 /       6.5
.E6  : 1111 :   /       6.4 /       6.3 /       6.2 /       6.1
.E7  : 1112 :   /       6.0 /       5.9 /       5.8 /       5.7
.E8  : 1113 :   /       5.6 /       5.6 /       5.5 /       5.5
.E9  : 1114 :   /       5.5 /       5.5 /       5.4 /       5.4
.E10 : 1115 :   /       5.4 /       5.4 /       5.4 /       5.4
.E11 : 1116 :   /       5.4 /       5.3 /       5.3 /       5.3
.E12 : 1117 :   /       5.3 /       5.3 /       5.3 /       5.3
.E13 : 1118 :   /       5.3 /       5.3 /       5.3 /       5.3
.E14 : 1119 :   /       5.3 /       5.3 /       5.3 /       5.3
.E15 : 1120 :   /       5.3 /       5.3 /       5.3 /       5.3
.E16 : 1121 :   /       5.3 /       5.3 /       5.3 /       5.3
.E17 : 1122 :   /       5.3 /       5.3 /       5.4 /       5.4
.E18 : 1123 :   /       5.4 /       5.4 /       5.4 /       5.4
.E19 : 1124 :   /       5.4 /       5.4 /       5.4 /       5.4
.E20 : 1125 :   /       5.4 /       5.4 /       5.4 /       5.4
.E21 : 1126 :   /       5.4 /       5.4 /       5.4 /       5.5
.E22 : 1127 :   /       5.5 /       5.5 /       5.6 /       5.6
.E23 : 1128 :   /       5.6 /       5.6 /       5.6 /       5.6
.E24 : 1129 :   /       5.6 /       5.6 /       5.5 /       5.4
.E25 : 1130 :   /       5.4 /       5.2 /       5.1 /       5.0
.E26 : 1201 :   /       4.8 /       4.6 /       4.5 /       4.3
.E27 : 1202 :   /       4.2 /       4.1 /       3.9 /       3.7
.E28 : 1203 :   /       3.5 /       3.3 /       3.1 /       3.0
.E29 : 1204 :   /       2.8

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.04 /      0.04 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.08 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:CHAMOIS 1 NE, MO - MISSOURI RIVER     HSA - LSX
:MINOR FLOOD STAGE    17.0 FT FCST ISSUANCE STAGE  15.0 FT
:MODERATE FLOOD STAGE 28.0 FT MAJOR FLOOD STAGE    31.0 FT
:LATEST  RIVER STAGE 5.3 FT AT 1712Z ON NOV 05

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       5.3 /       5.3 /       5.3 /       5.3

:
.ER CMSM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       6.3 /       6.0 /       5.7
.E2  : 1107 :   /       5.5 /       5.3 /       5.0 /       4.8
.E3  : 1108 :   /       4.5 /       4.3 /       4.0 /       3.8
.E4  : 1109 :   /       3.6 /       3.3 /       3.1 /       2.9
.E5  : 1110 :   /       2.7 /       2.5 /       2.4 /       2.3
.E6  : 1111 :   /       2.1 /       2.0 /       1.9 /       1.8
.E7  : 1112 :   /       1.7 /       1.6 /       1.5 /       1.4
.E8  : 1113 :   /       1.3 /       1.2 /       1.1 /       1.1
.E9  : 1114 :   /       1.0 /       1.0 /       0.9 /       0.9
.E10 : 1115 :   /       0.9 /       0.9 /       0.9 /       0.8
.E11 : 1116 :   /       0.8 /       0.8 /       0.8 /       0.8
.E12 : 1117 :   /       0.8 /       0.8 /       0.8 /       0.8
.E13 : 1118 :   /       0.8 /       0.8 /       0.7 /       0.7
.E14 : 1119 :   /       0.7 /       0.7 /       0.7 /       0.7
.E15 : 1120 :   /       0.7 /       0.7 /       0.7 /       0.7
.E16 : 1121 :   /       0.7 /       0.7 /       0.7 /       0.7
.E17 : 1122 :   /       0.7 /       0.8 /       0.8 /       0.8
.E18 : 1123 :   /       0.8 /       0.8 /       0.8 /       0.8
.E19 : 1124 :   /       0.8 /       0.8 /       0.9 /       0.9
.E20 : 1125 :   /       0.9 /       0.9 /       0.9 /       0.9
.E21 : 1126 :   /       0.9 /       0.9 /       0.9 /       0.9
.E22 : 1127 :   /       0.9 /       0.9 /       0.9 /       1.0
.E23 : 1128 :   /       1.0 /       1.0 /       1.1 /       1.1
.E24 : 1129 :   /       1.1 /       1.1 /       1.0 /       1.0
.E25 : 1130 :   /       0.9 /       0.9 /       0.8 /       0.6
.E26 : 1201 :   /       0.5 /       0.4 /       0.2 /       0.0
.E27 : 1202 :   /      -0.1 /      -0.3 /      -0.4 /      -0.6
.E28 : 1203 :   /      -0.7 /      -0.9 /      -1.1 /      -1.3
.E29 : 1204 :   /      -1.4

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.05 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 5 at 17Z is 0.05 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:HERMANN, MO - MISSOURI RIVER     HSA - LSX
:MINOR FLOOD STAGE    21.0 FT FCST ISSUANCE STAGE  19.0 FT
:MODERATE FLOOD STAGE 26.0 FT MAJOR FLOOD STAGE    33.0 FT
:LATEST  RIVER STAGE 10.8 FT AT 1430Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       9.6 /      10.6 /      10.8 /      10.8

:
.ER HRNM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      10.9 /      10.8 /      10.8
.E2  : 1107 :   /      11.0 /      11.4 /      11.8 /      12.5
.E3  : 1108 :   /      13.6 /      15.0 /      16.3 /      17.1
.E4  : 1109 :   /      17.2 /      16.6 /      15.4 /      13.7
.E5  : 1110 :   /      12.0 /      10.4 /       9.0 /       8.1
.E6  : 1111 :   /       7.4 /       6.9 /       6.4 /       6.1
.E7  : 1112 :   /       5.9 /       5.7 /       5.6 /       5.4
.E8  : 1113 :   /       5.3 /       5.2 /       5.1 /       5.0
.E9  : 1114 :   /       4.9 /       4.8 /       4.8 /       4.7
.E10 : 1115 :   /       4.7 /       4.6 /       4.6 /       4.6
.E11 : 1116 :   /       4.6 /       4.6 /       4.5 /       4.5
.E12 : 1117 :   /       4.5 /       4.5 /       4.5 /       4.5
.E13 : 1118 :   /       4.5 /       4.5 /       4.5 /       4.4
.E14 : 1119 :   /       4.4 /       4.4 /       4.4 /       4.4
.E15 : 1120 :   /       4.4 /       4.4 /       4.4 /       4.4
.E16 : 1121 :   /       4.4 /       4.4 /       4.4 /       4.4
.E17 : 1122 :   /       4.4 /       4.4 /       4.4 /       4.4
.E18 : 1123 :   /       4.4 /       4.4 /       4.4 /       4.4
.E19 : 1124 :   /       4.4 /       4.4 /       4.4 /       4.4
.E20 : 1125 :   /       4.5 /       4.5 /       4.5 /       4.5
.E21 : 1126 :   /       4.4 /       4.4 /       4.4 /       4.4
.E22 : 1127 :   /       4.4 /       4.4 /       4.4 /       4.5
.E23 : 1128 :   /       4.5 /       4.5 /       4.5 /       4.5
.E24 : 1129 :   /       4.6 /       4.6 /       4.6 /       4.6
.E25 : 1130 :   /       4.6 /       4.6 /       4.5 /       4.5
.E26 : 1201 :   /       4.4 /       4.3 /       4.3 /       4.2
.E27 : 1202 :   /       4.0 /       3.9 /       3.8 /       3.6
.E28 : 1203 :   /       3.5 /       3.4 /       3.3 /       3.1
.E29 : 1204 :   /       3.0

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.13 /      0.00 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.13 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:HERMANN, MO - MISSOURI RIVER     HSA - LSX
:LATEST  RIVER DISCHARGE 93.200 KCFS AT 1430Z ON NOV 06


:
.ER HRNM7  20241106 Z DC202411061505/DH18/QRIFFZZ/DIH6
:Flow Fcst      /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /    93.025 /    92.705 /    92.725
.E2  : 1107 :   /    94.121 /    97.600 /   101.268 /   108.622
.E3  : 1108 :   /   119.752 /   134.401 /   148.847 /   157.765
.E4  : 1109 :   /   158.718 /   151.785 /   138.648 /   121.019
.E5  : 1110 :   /   103.317 /    88.346 /    76.908 /    69.687
.E6  : 1111 :   /    64.953 /    60.995 /    57.958 /    55.941
.E7  : 1112 :   /    54.577 /    53.492 /    52.594 /    51.814
.E8  : 1113 :   /    51.108 /    50.453 /    49.840 /    49.264
.E9  : 1114 :   /    48.735 /    48.269 /    47.871 /    47.556
.E10 : 1115 :   /    47.317 /    47.135 /    46.995 /    46.877
.E11 : 1116 :   /    46.771 /    46.672 /    46.578 /    46.491
.E12 : 1117 :   /    46.412 /    46.340 /    46.278 /    46.224
.E13 : 1118 :   /    46.175 /    46.131 /    46.088 /    46.044
.E14 : 1119 :   /    46.000 /    45.956 /    45.911 /    45.866
.E15 : 1120 :   /    45.823 /    45.780 /    45.739 /    45.701
.E16 : 1121 :   /    45.666 /    45.636 /    45.614 /    45.601
.E17 : 1122 :   /    45.600 /    45.612 /    45.636 /    45.672
.E18 : 1123 :   /    45.717 /    45.769 /    45.823 /    45.877
.E19 : 1124 :   /    45.928 /    45.973 /    46.010 /    46.038
.E20 : 1125 :   /    46.056 /    46.065 /    46.065 /    46.058
.E21 : 1126 :   /    46.045 /    46.030 /    46.014 /    46.002
.E22 : 1127 :   /    46.000 /    46.011 /    46.043 /    46.100
.E23 : 1128 :   /    46.183 /    46.289 /    46.411 /    46.541
.E24 : 1129 :   /    46.663 /    46.765 /    46.833 /    46.856
.E25 : 1130 :   /    46.820 /    46.717 /    46.536 /    46.270
.E26 : 1201 :   /    45.917 /    45.477 /    44.958 /    44.370
.E27 : 1202 :   /    43.726 /    43.044 /    42.355 /    41.686
.E28 : 1203 :   /    41.041 /    40.406 /    39.756 /    39.074
.E29 : 1204 :   /    38.360

:

:________________________________________________________________

:WASHINGTON, MO - MISSOURI RIVER     HSA - LSX
:MINOR FLOOD STAGE    20.0 FT FCST ISSUANCE STAGE  18.0 FT
:MODERATE FLOOD STAGE 28.0 FT MAJOR FLOOD STAGE    31.0 FT
:LATEST  RIVER STAGE 9.1 FT AT 1445Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /       8.4 /       9.6 /      10.0 /       9.4

:
.ER WHGM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /       9.0 /       8.7 /       8.5
.E2  : 1107 :   /       8.3 /       8.4 /       8.6 /       9.0
.E3  : 1108 :   /       9.6 /      10.5 /      11.6 /      12.8
.E4  : 1109 :   /      13.6 /      13.7 /      13.3 /      12.2
.E5  : 1110 :   /      10.8 /       9.4 /       8.0 /       6.7
.E6  : 1111 :   /       5.8 /       5.4 /       5.1 /       4.7
.E7  : 1112 :   /       4.3 /       3.9 /       3.7 /       3.5
.E8  : 1113 :   /       3.3 /       3.2 /       3.1 /       3.0
.E9  : 1114 :   /       2.9 /       2.8 /       2.7 /       2.7
.E10 : 1115 :   /       2.6 /       2.5 /       2.5 /       2.5
.E11 : 1116 :   /       2.4 /       2.4 /       2.4 /       2.4
.E12 : 1117 :   /       2.4 /       2.3 /       2.3 /       2.3
.E13 : 1118 :   /       2.3 /       2.3 /       2.3 /       2.3
.E14 : 1119 :   /       2.3 /       2.3 /       2.3 /       2.3
.E15 : 1120 :   /       2.2 /       2.2 /       2.2 /       2.2
.E16 : 1121 :   /       2.2 /       2.2 /       2.2 /       2.2
.E17 : 1122 :   /       2.2 /       2.2 /       2.2 /       2.2
.E18 : 1123 :   /       2.2 /       2.2 /       2.2 /       2.2
.E19 : 1124 :   /       2.2 /       2.2 /       2.2 /       2.3
.E20 : 1125 :   /       2.3 /       2.3 /       2.3 /       2.3
.E21 : 1126 :   /       2.3 /       2.3 /       2.3 /       2.3
.E22 : 1127 :   /       2.3 /       2.3 /       2.3 /       2.3
.E23 : 1128 :   /       2.3 /       2.3 /       2.3 /       2.3
.E24 : 1129 :   /       2.3 /       2.3 /       2.4 /       2.4
.E25 : 1130 :   /       2.4 /       2.4 /       2.4 /       2.4
.E26 : 1201 :   /       2.4 /       2.3 /       2.3 /       2.2
.E27 : 1202 :   /       2.1 /       2.0 /       1.9 /       1.8
.E28 : 1203 :   /       1.7 /       1.6 /       1.4 /       1.3
.E29 : 1204 :   /       1.2

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.48 /      0.03 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.51 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:________________________________________________________________

:ST CHARLES 1 E, MO - MISSOURI RIVER     HSA - LSX
:MINOR FLOOD STAGE    25.0 FT FCST ISSUANCE STAGE  23.0 FT
:MODERATE FLOOD STAGE 30.0 FT MAJOR FLOOD STAGE    36.0 FT
:LATEST  RIVER STAGE 17.1 FT AT 1430Z ON NOV 06

:obs Stage      /       18Z /       00Z /       06Z /       12Z
:  1105         /      14.6 /      16.0 /      16.7 /      17.1

:
.ER SCLM7  20241106 Z DC202411061505/DH18/HGIFFZZ/DIH6
:Stage Fcst     /       12Z /       18Z /       00Z /       06Z
.E1  : 1106 :               /      17.2 /      17.2 /      17.0
.E2  : 1107 :   /      16.6 /      16.3 /      16.0 /      15.9
.E3  : 1108 :   /      16.0 /      16.2 /      16.6 /      17.5
.E4  : 1109 :   /      18.9 /      19.7 /      20.0 /      20.1
.E5  : 1110 :   /      19.7 /      19.4 /      18.8 /      17.8
.E6  : 1111 :   /      16.6 /      15.4 /      14.2 /      13.4
.E7  : 1112 :   /      12.8 /      12.3 /      11.8 /      11.4
.E8  : 1113 :   /      11.1 /      10.9 /      10.7 /      10.6
.E9  : 1114 :   /      10.5 /      10.3 /      10.2 /      10.1
.E10 : 1115 :   /      10.0 /      10.0 /       9.9 /       9.8
.E11 : 1116 :   /       9.8 /       9.7 /       9.7 /       9.7
.E12 : 1117 :   /       9.6 /       9.6 /       9.6 /       9.6
.E13 : 1118 :   /       9.6 /       9.6 /       9.6 /       9.5
.E14 : 1119 :   /       9.5 /       9.5 /       9.5 /       9.5
.E15 : 1120 :   /       9.5 /       9.5 /       9.5 /       9.5
.E16 : 1121 :   /       9.5 /       9.5 /       9.5 /       9.4
.E17 : 1122 :   /       9.4 /       9.4 /       9.4 /       9.4
.E18 : 1123 :   /       9.4 /       9.4 /       9.4 /       9.4
.E19 : 1124 :   /       9.4 /       9.4 /       9.5 /       9.5
.E20 : 1125 :   /       9.5 /       9.5 /       9.5 /       9.5
.E21 : 1126 :   /       9.5 /       9.5 /       9.5 /       9.5
.E22 : 1127 :   /       9.5 /       9.5 /       9.5 /       9.5
.E23 : 1128 :   /       9.5 /       9.5 /       9.5 /       9.5
.E24 : 1129 :   /       9.5 /       9.5 /       9.5 /       9.6
.E25 : 1130 :   /       9.6 /       9.6 /       9.6 /       9.6
.E26 : 1201 :   /       9.6 /       9.6 /       9.6 /       9.6
.E27 : 1202 :   /       9.5 /       9.4 /       9.4 /       9.3
.E28 : 1203 :   /       9.2 /       9.0 /       8.9 /       8.8
.E29 : 1204 :   /       8.7

:Local observed 6-hr basin-averaged precip(inches) (PAST 24 hrs):
:           /       18Z /       00Z /       06Z /       12Z
: 1105      /      0.72 /      0.04 /      0.00 /      0.00
:
:Local observed 24-hr basin-averaged precip total
: QPE Total Ending Nov 6 at 14Z is 0.76 inches
:
:Local forecast 6-hr basin-averaged precip(inches) (NEXT 48 hrs):
:           /       12Z /       18Z /       00Z /       06Z
: 1106                  /      0.00 /      0.00 /      0.00
: 1107      /      0.00 /      0.00 /      0.00 /      0.00
: 1108      /      0.00
:
:Local forecast 48-hr basin-averaged precip total
: QPF Total Ending Nov 08  0.00 inches


:****************************************************************
:COMMENT
:
:
:HSA - Hydrologic Service Area
:WFO - Weather Forecast Office
:FSD - NWS WFO Sioux Falls, South Dakota
:OAX - NWS WFO Omaha, Nebraska
:EAX - NWS WFO Pleasant Hill, Missouri
:LSX - NWS WFO St. Louis, Missouri
:OBS - Observed
:EST - Estimated
:M - Missing
:Stage Fcst - River Stage forecast including future precipitation
:Flow Fcst - River Flow forecast including future precipitation
:Precip - Precipitation
:QPE - Observed radar estimated precipitation
:QPF - Forecasted mean areal precipitation for local basin
:
:
$$
:MBRFC  ldh
:...END of MESSAGE...